{"id":29524,"date":"2018-04-12T11:00:41","date_gmt":"2018-04-12T08:00:41","guid":{"rendered":"http:\/\/www.bghaber.org\/bghaber\/?p=29524"},"modified":"2019-06-30T00:01:18","modified_gmt":"2019-06-29T21:01:18","slug":"ips-sirketinin-kircaalide-kurdugu-fabrika-bu-yil-tamamlanacak","status":"publish","type":"post","link":"https:\/\/www.bghaber.org\/bghaber\/ips-sirketinin-kircaalide-kurdugu-fabrika-bu-yil-tamamlanacak\/","title":{"rendered":"\u201cIPS\u201d \u015eirketinin K\u0131rcaali\u2019de Kurdu\u011fu Fabrika Bu Y\u0131l Tamamlanacak"},"content":{"rendered":"<p>International Power Supply (IPS) \u015eirketi\u2019nin K\u0131rcaali\u2019de 2017\u2019nin Eyl\u00fcl ay\u0131nda kurmaya ba\u015flad\u0131\u011f\u0131 EXERON &#8211; y\u00fcksek teknoloji enerji g\u00fc\u00e7 kayna\u011f\u0131 mod\u00fcl sistemi \u00fcretimi yapacak fabrikan\u0131n in\u015faat\u0131 2018&#8217;in ikinci \u00e7eyre\u011finde tamamlanacak. Bu fabrikada t\u00fcm \u00fcretim d\u00f6ng\u00fcs\u00fcn\u00fcn birle\u015ftirilmesi ve EXERON &#8211; ak\u0131ll\u0131 enerji sistemlerinin \u00fcretimine ba\u015flan\u0131lmas\u0131 ama\u00e7lanmaktad\u0131r.<\/p>\n<p>Sermaye yat\u0131r\u0131m\u0131, fabrikan\u0131n tam kapasitesinin a\u015famal\u0131 olarak art\u0131r\u0131lmas\u0131yla 32 milyon levaya mal olacak. \u0130lk y\u0131lda fabrikada yakla\u015f\u0131k 100-120 ki\u015finin \u00e7al\u0131\u015fmas\u0131 bekleniyor ve \u00e7al\u0131\u015fanlar 2019&#8217;un ba\u015f\u0131na kadar 240 ki\u015fiye ula\u015facak. \u015eirketin uzun vadeli plan\u0131nda projenin ikinci bir k\u0131sm\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Projenin ikinci k\u0131sm\u0131nda \u00e7al\u0131\u015fma kapasitesinin iki kat\u0131na \u00e7\u0131kaca\u011f\u0131 ve i\u015f\u00e7i say\u0131s\u0131n\u0131n 600 ki\u015fiye ula\u015faca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Yat\u0131r\u0131m plan\u0131, K\u0131rcaali\u2019de Tren Gar\u0131 b\u00f6lgesinde bulunan Depo Ardiyeciler Sanayi Sitesi\u2019nde yakla\u015f\u0131k 19 dekarl\u0131k bir alana y\u00fcksek teknoloji g\u00fc\u00e7 kayna\u011f\u0131 \u00fcretim tesisi ve depolama tesisi ve ofislerin yan\u0131 s\u0131ra t\u00fcm ek binalar ve tesisler in\u015fa edilmesini \u00f6ng\u00f6rmektedir. Toplam in\u015faat alan\u0131 8224 m\u00b2, bina in\u015faat alan\u0131 ise 6925 m\u00b2\u2019dir. Arazi IPS&#8217;ye aittir.<\/p>\n<p>IPS&#8217;nin ilk seri \u00fcretim tesisi kurmak i\u00e7in K\u0131rcaali\u2019yi se\u00e7mesi, yerel otoritelerin b\u00fcy\u00fck deste\u011finden, bu fabrikan\u0131n onlar\u0131n \u015fehrinde in\u015fa edilmesine yard\u0131mc\u0131 olma iste\u011fi ve duyarl\u0131l\u0131\u011f\u0131ndan kaynakland\u0131. IPS\u2019nin inisiyatifi, ayn\u0131 zamanda Bulgaristan Yat\u0131r\u0131m Ajans\u0131 arac\u0131l\u0131\u011f\u0131yla \u015firkete A S\u0131n\u0131f Yat\u0131r\u0131m Sertifikas\u0131 veren Ekonomi Bakanl\u0131\u011f\u0131 taraf\u0131ndan da takdir edildi.<\/p>\n<p><b>Enerji Ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131<\/b><\/p><div id=\"bghab-106551583\" class=\"bghab-icerik-icine bghab-entity-placement\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-6203283170189293\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-client=\"ca-pub-6203283170189293\" \ndata-ad-slot=\"7303146466\" \ndata-ad-layout=\"in-article\"\ndata-ad-format=\"fluid\" data-full-width-responsive=\"true\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p>IPS\u2019nin fabrikas\u0131, ulusal elektrik \u015febekesinden tamamen ba\u011f\u0131ms\u0131z olaca\u011f\u0131 i\u00e7in Bulgaristan&#8217;daki t\u00fcr\u00fcn\u00fcn ilk \u00f6rne\u011fi olacak. Fabrika, yenilenebilir enerji kaynaklar\u0131 (g\u00fcne\u015f panelleri ve r\u00fczgar t\u00fcrbinleri), \u015farj edilebilir piller ve t\u00fcm elektrik \u00fcretim d\u00f6ng\u00fcs\u00fcn\u00fc y\u00f6netecek, takip edecek ve optimize edecek e\u015fi benzeri bulunmayan EXERON- g\u00fc\u00e7 kayna\u011f\u0131 sistemi ile birlikte enerji t\u00fcketimini sa\u011flayacak.<\/p>\n<p>Elektrik \u00fcretim s\u00fcrecini destekleyecek \u015fekilde \u00e7at\u0131ya monte edilecek yakla\u015f\u0131k 1400 adet fotovoltaik panelin ve binan\u0131n kuzeydo\u011fu ucunda yer alacak \u00fc\u00e7 r\u00fczgar t\u00fcrbinin kurulmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Onlar\u0131n elektrik enerjisi kurulu g\u00fcc\u00fc yakla\u015f\u0131k 360 kWp olacak ve tesiste t\u00fcm t\u00fcketicilere elektrik temin etmek i\u00e7in yeterli olacakt\u0131r. Yenilenebilir kaynaklardan elektrik \u00fcretiminde bir fazlal\u0131k varsa, bu fazlal\u0131k \u015farj edilebilir pilleri \u015farj etmek i\u00e7in kullan\u0131lacakt\u0131r.<\/p>\n<p>Yenilenebilir kaynaklardan \u00fcretilen ve ak\u00fclerde saklanan elektrik, sadece fabrikan\u0131n kendi ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lamas\u0131 i\u00e7in kullan\u0131lacakt\u0131r ve \u015febekeye geri g\u00f6nderilmeyecektir. Bundan ba\u015fka fabrika alan\u0131nda elektrikli arabalar i\u00e7in 12 tane \u015farj istasyonu da a\u00e7\u0131lacak.<\/p>\n<p>B\u00f6yle bir m\u00fchendislik \u00e7\u00f6z\u00fcm\u00fcn\u00fcn ilham\u0131, IPS taraf\u0131ndan yarat\u0131lan EXERON- teknoloji sistemi ile nihai t\u00fcketicilere tamamen otonom, g\u00fcvenilir ve y\u00fcksek kaliteli elektrik enerjisinin nas\u0131l temin edilebilece\u011fini g\u00f6sterme iste\u011finden kaynaklan\u0131yor. Bu teknoloji sistemi, geleneksel \u00e7\u00f6z\u00fcmlerin ekonomik veya teknik a\u00e7\u0131dan kar sa\u011flamad\u0131\u011f\u0131 problemlere \u00e7\u00f6z\u00fcm getirmektedir.<\/p>\n<p><b>Potansiyel<\/b><\/p><div id=\"bghab-2986891876\" class=\"bghab-icerik-icine-10-paragraf bghab-entity-placement\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-6203283170189293\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-client=\"ca-pub-6203283170189293\" \ndata-ad-slot=\"7303146466\" \ndata-ad-layout=\"in-article\"\ndata-ad-format=\"fluid\" data-full-width-responsive=\"true\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p>D\u00fcnya \u00e7ap\u0131nda enerji \u015febekesine eri\u015fimi olmayan b\u00f6lgelerin elektrifikasyonu i\u00e7in b\u00fcy\u00fck potansiyele sahip olunmas\u0131, elektrik \u015febekesine eri\u015fimi olmayan b\u00f6lgelerde g\u00fc\u00e7 kayna\u011f\u0131 sistemleri i\u00e7in artan talebi kar\u015f\u0131lamak \u00fczere IP\u2019nin seri \u00fcretim tesisi kurmas\u0131 ve \u00fcretim kapasitesini art\u0131rmas\u0131 ihtiyac\u0131n\u0131 ortaya koymaktad\u0131r.<\/p>\n<p>Herkesin elektri\u011fe eri\u015fimi, geli\u015fmekte olan d\u00fcnyada \u00f6nde gelen bir sorun olmaya devam etmektedir ve bu alanda son y\u0131llarda \u00f6nemli ilerlemeler kaydedilmesine ra\u011fmen, istatistikler d\u00fcnya genelinde yakla\u015f\u0131k 1,1 milyar insan\u0131n elektri\u011fe eri\u015fimi olmad\u0131\u011f\u0131n\u0131 g\u00f6steriyor. Sahra Alt\u0131 Afrika ve G\u00fcneydo\u011fu Asya gibi b\u00f6lgelerde tam elektrifikasyonun sa\u011flanmas\u0131, elektri\u011fe eri\u015fimsiz b\u0131rak\u0131lan ki\u015filerin genellikle uzak topluluklarda veya k\u00fc\u00e7\u00fck adalarda gibi ula\u015f\u0131m\u0131 en zor yerlerde ya\u015fad\u0131klar\u0131 i\u00e7in daha da zorla\u015fmaktad\u0131r. Ulusal elektrik \u015firketlerinin elektrik \u015febekelerinin geni\u015fletilmesine yat\u0131r\u0131m yapmas\u0131 ekonomik olarak mant\u0131ks\u0131zd\u0131r ve bu da g\u00fc\u00e7 kayna\u011f\u0131 mod\u00fcl sistemleri olu\u015fturulmas\u0131 i\u00e7in b\u00fcy\u00fck bir potansiyel olu\u015fturmaktad\u0131r.<\/p>\n<p>K\u0131rcaali tesislerinde \u00fcretilecek mod\u00fcl sistemi, uzak, ula\u015f\u0131lmas\u0131 zor alanlar\u0131n elektriklendirilmesi sorununa \u00e7\u00f6z\u00fcm\u00fcn bir par\u00e7as\u0131d\u0131r. Tesis ayr\u0131ca, petrol ve askeri sekt\u00f6rlere y\u00f6nelik g\u00fc\u00e7 kaynak \u00fcr\u00fcnleri de \u00fcretecek. Tesisin \u00fcr\u00fcn portf\u00f6y\u00fcs\u00fcn\u00fcn \u00f6nemli bir bile\u015feni, yenilenebilir g\u00fcne\u015f enerjisi kullan\u0131m\u0131 yoluyla ula\u015f\u0131lmas\u0131 zor yerlere elektrik eri\u015fimi ve g\u00fc\u00e7 kayna\u011f\u0131na y\u00f6nelik \u00e7\u00f6z\u00fcm aranan telekom\u00fcnikasyon sekt\u00f6r\u00fc i\u00e7in de \u00e7\u00f6z\u00fcmler i\u00e7ermektedir.<\/p>\n<p><b>Yeni fabrikada mimari ve yap\u0131 teknolojileri<\/b><\/p>\n<p>Ana bina, \u00fcretim ve depolama tesisi ve idari b\u00f6l\u00fcm ve lojman olmak \u00fczere iki fonksiyonel par\u00e7aya b\u00f6l\u00fcnm\u00fc\u015ft\u00fcr. \u00dcretim ve depolama tesisi a\u015fa\u011f\u0131dakilerden olu\u015facakt\u0131r: hammadde deposu, elektronik montaj alan\u0131, mekanik montaj alan\u0131, test b\u00f6lgesi, son test ve kalite kontrol alan\u0131, ambalaj ve nihai \u00fcr\u00fcn deposu. \u00dcretim s\u00fcreci a\u015fa\u011f\u0131daki faaliyetleri kapsayacakt\u0131r: hammaddelerin haz\u0131rlanmas\u0131 ve kurulum alan\u0131na ta\u015f\u0131nmas\u0131, bitmi\u015f par\u00e7alar\u0131n test edilmesi, son test ve paketleme i\u015flemi.<\/p><div id=\"bghab-1911399557\" class=\"bghab-icerik-icine-15-paragraf bghab-entity-placement\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-6203283170189293\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-client=\"ca-pub-6203283170189293\" \ndata-ad-slot=\"7303146466\" \ndata-ad-layout=\"in-article\"\ndata-ad-format=\"fluid\" data-full-width-responsive=\"true\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p>\u0130dari ofisleri ve lojmanlar iki katl\u0131 bir binada bulunacak. Bu bina idari personelin kullanaca\u011f\u0131 ofisler, \u00fcretimde \u00e7al\u0131\u015fanlar i\u00e7in s\u0131hhi kesimler ve lojmanlar, mutfak ve yemekhane ve teknik odalar bar\u0131nd\u0131racak.<\/p>\n<p>Cephe d\u00fczeni i\u00e7in uzun \u00f6m\u00fcrl\u00fc modern yap\u0131 malzemeleri kullan\u0131l\u0131yor. \u00dcretim ve depolama tesisinin d\u0131\u015f duvarlar\u0131 dikey kurulum i\u00e7in \u00fc\u00e7 katmanl\u0131 termal panellerle doldurulacakt\u0131r. \u00c7at\u0131da g\u00fcn\u00fcn b\u00fcy\u00fck bir k\u0131sm\u0131nda do\u011fal \u0131\u015f\u0131kland\u0131rma ve i\u015fyerlerinde ek konfor sa\u011flayacak \u015fekilde boyutland\u0131r\u0131lm\u0131\u015f \u0131\u015f\u0131k \u015feritler bulunmaktad\u0131r.<\/p>\n<p>\u0130dari ofisleri ve lojmanlar bulunan binan\u0131n cephesinde ana giri\u015f ve ikinci kattaki ofislerin bulundu\u011fu kesimde IPS kurumsal standartlar\u0131na g\u00f6re iki renkte al\u00fcminyum kompozit panellerle kaplama \u00f6ng\u00f6r\u00fcl\u00fcyor. Cephe \u00e7\u00f6z\u00fcm\u00fcn\u00fcn ana unsuru ana giri\u015fin \u00f6n\u00fcndeki viz\u00f6rd\u00fcr. Viz\u00f6r\u00fcn, ana giri\u015fte lobi alan\u0131nda as\u0131l\u0131 bir tavana uyumlu bir \u015fekilde birle\u015fen \u00fcst\u00fcndeki destekleyici yap\u0131ya &#8220;\u00f6r\u00fcmcek&#8221; sistemi ile eklenmi\u015f cam malzemesi ile yap\u0131lmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Bu viz\u00f6r, binan\u0131n karakteristik g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc verir ve kompozisyonun son r\u00f6tu\u015fudur.<\/p>\n<p>Binan\u0131n iklimlendirilmesi ve havaland\u0131rmas\u0131 i\u00e7in y\u00fcksek performansl\u0131 sistemler projeye dahil edilmi\u015ftir. Mikro iklim \u015fartlar\u0131n\u0131 sa\u011flamak i\u00e7in idari ofisleri ve lojmanla ilgili mevzuat gerekliliklerine g\u00f6re konfor ve enerji verimlili\u011fi gereksinimlerini kar\u015f\u0131layan merkezi bir VRV klima sistemi \u00f6ng\u00f6r\u00fcl\u00fcyor. Projede geli\u015ftirilen sistem, optimum konforun sa\u011flanmas\u0131 ve mevsimsel verimlili\u011fin art\u0131r\u0131lmas\u0131 i\u00e7in y\u00fcke g\u00f6re inverter kompres\u00f6r\u00fcn h\u0131z\u0131n\u0131 d\u00fczenleyen de\u011fi\u015fken debili so\u011futucu ak\u0131\u015fkan teknoloji sistemine dayanmaktad\u0131r.<\/p>\n<p>\u00dcretim ve depolama tesisi i\u00e7in, \u00e7al\u0131\u015fanlara gerekli olan taze hava dahil olmak \u00fczere mikro iklim parametrelerinin korunmas\u0131n\u0131 sa\u011flamak i\u00e7in ayr\u0131 klima \u00fcniteleri sa\u011flanmaktad\u0131r. A\u00e7\u0131k hava klimas\u0131 geli\u015ftirildi ve ayr\u0131 b\u00f6lgeye verilen hava, \u00e7at\u0131 iklimlendirme \u00fcnitelerinde \u00f6nceden i\u015flenmektedir. Bu tesisler, y\u00fcksek performans ve d\u00fc\u015f\u00fck enerji t\u00fcketimi sa\u011flayan EC motorlu fanlar ile donat\u0131lm\u0131\u015ft\u0131r. Buna ek olarak projede yer alan tesislerde egzoz havas\u0131 s\u0131cakl\u0131\u011f\u0131ndan yararlanmay\u0131 ve uygun atmosfer ko\u015fullar\u0131nda serbest so\u011futmay\u0131 sa\u011flayan aktif termodinamik geri kazan\u0131mla dahili \u0131s\u0131 pompas\u0131 b\u00f6l\u00fcm\u00fc bulunmaktad\u0131r.<\/p><div id=\"bghab-1534409410\" class=\"bghab-icerik-icine-20-paragraf bghab-entity-placement\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-6203283170189293\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-client=\"ca-pub-6203283170189293\" \ndata-ad-slot=\"7303146466\" \ndata-ad-layout=\"in-article\"\ndata-ad-format=\"fluid\" data-full-width-responsive=\"true\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p>Bina, d\u00fc\u015f\u00fck enerji t\u00fcketimi ve uzun \u00f6m\u00fcrl\u00fc, y\u00fcksek LED ayd\u0131nlatma teknolojisi ile tasarlanm\u0131\u015ft\u0131r. Yeni fabrika, y\u00fcksek kaliteli malzemeleri, modern bina teknolojilerini ve modern enerji \u00fcretim y\u00f6ntemlerini birle\u015ftiriyor ve bu, IPS&#8217;nin her giri\u015fimde inovasyon kullanma arzusuna i\u015faret etmektedir.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>K\u0131rcaali Haber<\/p>\n<div id=\"bghab-4037439679\" class=\"bghab-yazi-altinda bghab-entity-placement\"><div class=\"bghab-adlabel\">Reklamlar<\/div><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script>\r\n<!-- bghaber-yaz\u0131-sonu -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-6203283170189293\"\r\n     data-ad-slot=\"4222328180\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><\/div><br style=\"clear: both; display: block; float: none;\"\/>","protected":false},"excerpt":{"rendered":"<p>International Power Supply (IPS) \u015eirketi\u2019nin K\u0131rcaali\u2019de 2017\u2019nin Eyl\u00fcl ay\u0131nda kurmaya ba\u015flad\u0131\u011f\u0131 EXERON &#8211; y\u00fcksek teknoloji enerji g\u00fc\u00e7 kayna\u011f\u0131 mod\u00fcl sistemi \u00fcretimi yapacak fabrikan\u0131n in\u015faat\u0131 2018&#8217;in<\/p>\n","protected":false},"author":29,"featured_media":29525,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[9,1],"tags":[896,32],"class_list":["post-29524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ekonomi","category-haberler","tag-ips","tag-kircaali"],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.bghaber.org\/bghaber\/wp-content\/uploads\/2018\/04\/IPS-kircaali-fabrika.jpg?fit=750%2C425&ssl=1","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pc2PfJ-7Gc","_links":{"self":[{"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/posts\/29524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/comments?post=29524"}],"version-history":[{"count":0,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/posts\/29524\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/media\/29525"}],"wp:attachment":[{"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/media?parent=29524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/categories?post=29524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bghaber.org\/bghaber\/wp-json\/wp\/v2\/tags?post=29524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}